Liftmaster 4ATLES46B Class IV ATL Scissor Lift Package

£31,145.00

Liftmaster 4ATLES46B Package with 3.5tonne Scissor Lift, 4600mm with 2 years warranty. delivered and installed UK Mainland  

FROM £31,145.00+vat    Lease finance example:-  1+59 months at £721.94.+vat

 

 

 

Liftmaster 4ATLES46B  Class IV ATL Package with 3.5 tonne Scissor Lift, with 2 years warranty 

Package consisting of:-

  • 3500kg Scissor Lift, 4600mm platforms
  • Equipped with radius plates, hydraulic play detector plates, inspection lamp
  • 2.0t Hydraulic Jacking Beam
  • Roller Brake Tester complete with Axle weighing
  • Console with Windows based PC
  • 22” Colour monitor
  • A4 Printer
  • Installation frame for the brake tester
  • Headlamp Beam Tester

£31,145.00+vat      Lease finance example:-  1+59 months at £721.94. +vat

Or Including

  • Integral 4 Gas Analyser & Diesel Smoke Meter
  • Mirrors
  • Accelerator Rod
  • Full Accessory Pack, tools & board, notice board, signs, charts, electronic brake meter. trailer socket tester etc.
  • 24 months full manufacturer’s warranty.
  • All delivered, installed, calibrated and commissioned.
  • All calibration, load and level certificates, manuals and type approval documents are provided.
  • Exclusions :- All electrical supply and final connections to the equipment are excluded
  • Electrical requirements.    Lift 415v / 3ph / 20amp +E+N.   Brake tester 415v / 3ph / 30amps “C” dated fuses +E+N

With Emissions 2 years warranty on emissions and 6 months calibration, all Accessories

£38,185.00 +vat      Lease finance example:- 1+59 months at £885.12+vat

Civil Works Option.

 To fabricate mild steel galvanized shuttering to form the lift recess, to manufacture brake tester sump, free issue frame and deliver to site. To mark out, saw cut, break out and excavate to form the lift recess and brake tester sump. Dispose of the non-contaminated concrete and spoil. Form a concrete base to lift recess dimensions, fit reinforcing, supply and pour concrete as required. Fit shuttering and secure to the base, fit brake tester sump and level to existing floor. Drill and dowel existing floor around lift recess and brake tester sump, provide and pour concrete around the shuttering and sump and level off to existing floor with steel float finish. Remove all temporary supports and remove all equipment from site.

P.O.A.

Shopping Basket
Scroll to Top